Case Study 9: Grill Shack, 167 Belgrave Gate, LE1 3HS

Introduction A Schedule of Condition acts as written and or photographic evidence of the state of the property at the time the lease is granted. It will consist of a list of photographs and additional description of the property and is appended to the signed lease. Our approach We were commissioned by Grill Shack to

Continue Reading

Case Study 8: Ivy Cottage, 22 Main Street, Kirby Bellers, Leicestershire

Introduction One Building Solution Ltd were appointed to carry a building condition survey for a client who was considering buying the property known as the Ivy Cottage. The client required the report to identify all known defects, confirm that the building is structurally stable and weather tight.  The client further requested One Building Solution Ltd

Continue Reading

Case Study 7: 7-9 Fennel Street, Loughborough, Leicestershire, LE11 1UQ

An instruction was received from Twentytwenty – Life Skills on Wednesday 13th September 2017 to undertake a Pre-Acquisition survey prior to them acquiring the lease of the property. The report was to cover the condition, identify all defects and future maintenance requirements along with  of the building budget cost along with commenting on the legislative

Continue Reading

Case Study 6: Saffron Health

Saffron Health Trust commissioned One Building Solution Ltd to carry out the role as Monitoring Surveyor for the development of a new build doctors’ surgery which covered the inspection of the structure and fabric as well as the mechanical and electrical installation. The project was procured under a Design and Build Contract and although One

Continue Reading

Case Study 5: Refurbishment and conversion of stable block and living sleeping accommodation

Mr and Mrs Roe commissioned One Building Solution Ltd to carry out architectural design for a proposed refurbishment and conversion of a existing 19th Century coach house with living accommodation to a extended kitchen with pet areas with increased living and sleeping accommodation to the first floor. Although the building had been delisted by the

Continue Reading

Case Study 4: Two storey side and single storey rear extension, Thorpe Ashley, Leicester

Mr and Mrs D Duncan commissioned One Building Solution Ltd to carry out architectural design for a proposed two storey side and single storey rear extension. One Building Solution Ltd, provided the client with full and detailed working drawings for the submission of Planning and Building Regulations application. On successfully gaining the required approvals,One Building Solution Ltd

Continue Reading

Case Study 3: Coleorton Hall, Constable Way, Coleorton Way.

One Building Solution Ltd in conjunction with Wide Horizons Limited where commissioned to carry out a external fabric and internal landlord area condition survey report along with plan preventative maintenance cost schedule over a 10 year period on a Grade II,19th-century country mansion which is known as Coleorton Hall Our approach A detailed visual and

Continue Reading

Case Study 2: Development feasibility at Leicester Nirvana Football Club, Leicester.

Leicester Nirvana is a voluntary ran Football Club that nurtures junior talent from the age of 2 years up to under 18’s, Seniors reserves and Seniors first team. They provide a clear pathway for young players to develop in to men’s football. The club has grown tremendously over the years and now has close to

Continue Reading

Case Study 1: Land development Gloucester Crescent, South Wigston, Leicester

here One Building Design SI Properties instructed One Building Solution Ltd to carry out architectural design for a proposed bungalow to be constructed on a site they acquired. One Building Solution Ltd, provided the client with full and detailed working drawings for the submission of Planning and Building Regulations application. On successfully gaining the required approvals, One